JBJ 28g Nano - How to install chiller

bonzoid

New Member
Hi,
Can any of you guys help me in instructions on how to install the Hailea HC 150A chiller for my jbj 28g nano tank. I aquired this second hand without any instructions. Any help would be much appreciated. I am having serious problems with overheating even with a clip on fan on the back of the tank.
 

aj2656

New Member
You are going to need some 1/2" clear flexable tubing and you will need a little over twice the length from the tank to the chiller and you will need a MJ1200 pump and if you don't have the JBJ connection kit that has the end peices you will need to get them or something like it look the kit up on the JBJ web site cut the tubing in half and attach the MJ1200 to one end and the other end of that tubing to the inlet side of the chiller then put the pump into either the right or left back chambers then attach the remaining tubing to the outlet side of the chiller and put the other end of hte tubing into the back chamber oppisit from the one with the pump in it turn the pump on before turning on the chiller check for leaks and then turn ther chiller on I am not sure how to adjust your chiller look online for instructons

Allen
 

bonzoid

New Member
Thanks Allen for the very useful information. Question. How can I put the mj1200 pump into the left or right rear chamber when there is already the existing stock pump and piping, elbow in there? There isn't enough room. Sorry I'm new to this and need extra help. Thanks Pete
 

aj2656

New Member
You will need to remove the elbow from the wall to insert the MJ into the chamber then reinstall the elbow to the wall (to remove the elbow you will need to twist it back and forth while applying pressure and it will come off)

Allen
 
Top