TimSchmidt
New Member
This weekend my to do list is:
1. 30% water change.
2. Build new 30 gallon sump/fuge.
3. Clean up the wiring on the new lighing (left them long just in case, now I can them up)
4. Adjust heating.
5. Switch from flexible tubing to PVC
6. Purchase new RO/DI container
1. 30% water change.
2. Build new 30 gallon sump/fuge.
3. Clean up the wiring on the new lighing (left them long just in case, now I can them up)
4. Adjust heating.
5. Switch from flexible tubing to PVC
6. Purchase new RO/DI container